Traralgon Water Treatment Plant
Gippsland
Traralgon Water Treatment Plant
Cutting Force provided extensive road and wall sawing, large core drilling and hydraulic hand sawing and ring sawing for the modernisation and total refurbishment of the Traralgon Water Treatment Plant.Works covered a full time period of approximately three months and entailed confined space drilling and sawing, the removal of approximately 84 tonnes of concrete in total and the drilling of 8 large core holes up to 800mm in diameter.
Client: Gippsland Water, Traralgon Victoria and Ferguson Contractors.