Traralgon Water Treatment Plant

Gippsland


Works covered a full time period of approximately three months and entailed confined space drilling and sawing, the removal of approximately 84 tonnes of concrete in total and the drilling of 8 large core holes up to 800mm in diameter.

Client: Gippsland Water, Traralgon Victoria and Ferguson Contractors.