Hazelwood Power Station Demolition

Hazelwood Power Station Demolition

Hazelwood Power Station Demolition   The Hazelwood demolition project was to remove 8 x 137 metre high chimneys that were constructed in the 1960`s as part of a decommissioned power station removal. After intensive study and proposals, it was decided that the...
HCMT Pakenham East Rail Depot

HCMT Pakenham East Rail Depot

High Capacity Metro Train (HCMT) Pakenham East Rail Depot   The project for Downer was to build a rail facility / depot that would house the new next generation trains to meet the future needs of Melbourne. The new depot comprised of a maintenance facility,...
Tunnel Cross Passage Cutting

Tunnel Cross Passage Cutting

Cutting Force has performed the cross passages cut out on various road tunnels, Airport Link and Legacy Way in Brisbane. Cutting Force is about to commence Cross Passage Openings works for CYP on the Metro Tunnel Project Eastern Precinct here in Melbourne.
Eastlink Freeway Pre-Cast Facility

Eastlink Freeway Pre-Cast Facility

Eastlink Freeway Pre-Cast Facility   For two years a Cutting Force Concrete Sawing crew of 6 worked full time to provide all required sawing, core drilling, hammer drilling and grinding for the massive Eastlink project and other major works on Police Road and...
Fairbairn Dam

Fairbairn Dam

Fairnbairn Dam   The Fairbairn Dam is an earth-filled embankment dam across the Nogoa River, located south-west of Emerald in Central Queensland, Australia. Constructed in 1972 for the primary purpose of irrigation, the impoundment created by the dam serves as...