HCMT Pakenham East Rail Depot

HCMT Pakenham East Rail Depot

High Capacity Metro Train (HCMT) Pakenham East Rail Depot   The project for Downer was to build a rail facility / depot that would house the new next generation trains to meet the future needs of Melbourne. The new depot comprised of a maintenance facility,...
Hazelwood Power Station Demolition

Hazelwood Power Station Demolition

Hazelwood Power Station Demolition   The Hazelwood demolition project was to remove 8 x 137 metre high chimneys that were constructed in the 1960`s as part of a decommissioned power station removal. After intensive study and proposals, it was decided that the...
Eastlink Freeway Pre-Cast Facility

Eastlink Freeway Pre-Cast Facility

Eastlink Freeway Pre-Cast Facility   For two years a Cutting Force Concrete Sawing crew of 6 worked full time to provide all required sawing, core drilling, hammer drilling and grinding for the massive Eastlink project and other major works on Police Road and...
Traralgon Water Treatment Plant

Traralgon Water Treatment Plant

Traralgon Water Treatment Plant   Cutting Force provided extensive road and wall sawing, large core drilling and hydraulic hand sawing and ring sawing for the modernisation and total refurbishment of the Traralgon Water Treatment Plant.Works covered a full time...
The Esplanade Resort & Spa – Lakes Entrance

The Esplanade Resort & Spa – Lakes Entrance

The Esplanade Resort & Spa, Lakes Entrance Cutting Force’s services were engaged to undertake extensive Road Sawing, Core Drilling and Stitch Drilling to remove the third story floor of this new multi-storey resort/motel at Lakes Entrance in Victoria. This...